TDC CONTRACT – The Terrace Sewer Upgrade, Timaru (Bursting)
Project Description: Pipe burst with PB30 new 180 SDR 17 PE main approx. 55m long. Burst house laterals.
TDC CONTRACT 2016 – TeWeka St & Evans St Watermain Upgrade
Installed approx. 200m of watermain ranging from 63mm – 125mm Dia PE pipe using trenchless and open cut methods. Including fire hydrants, house laterals and various associated fittings. Pipe burst existing cast main under Evans Street.
PUKEURI WORKS – Fire Rebuild
Construction of a new lamb cutting room and staff amenities.
RANGER – Timaru Aquatic Centre
Under slab pool plumbing, drainage, front of wall plumbing, temporary amenities and work to existing pool.